Lay out area to be defined. A garden hose or string works
best.
Spade a vertical wedge in ground approximately 4" deep.
Begin placing edging in trench with the top 1/2" (12.5cm)
above what will become the compacted finish grade.
Slide ends of edging strips together to connect pieces.
Installer can connect the adjacent section of edging prior to or
after the sections are placed in the trench. A minimum of 2 inches
(50.8mm) of overlap is recommended.
Drive spikes through holes at a 45 degree angle. Start with
the beginning piece of edging.
Stake and backfill edging continuously to ensure straight
lines, compacting both sides to ensure the finish grade is
approximately 1/2" below top of edging.
Cut section to the desired length at the end of the bed
area.